_ Select the incorrect statement.$? |
| A. | Stop or red time of a signal is the sum of go and clearance intervals for the cross flow. |
| B. | Go or green time of a signal is the sum of stop and clearance intervals for the cross flow. |
| C. | Clearance time is generally 3 to 5 seconds. |
| D. | The cycle length is normally 40 to 60 seconds for two phase signals. |
| Answer» C. Clearance time is generally 3 to 5 seconds. | |