MCQOPTIONS
Saved Bookmarks
| 1. |
Projects with __________ are preferred |
| A. | Lower payback period |
| B. | Normal payback period |
| C. | Higher payback period |
| D. | Any of the above |
| Answer» B. Normal payback period | |