MCQOPTIONS
Saved Bookmarks
| 1. |
Pick up the correct statement from the following __? |
| A. | In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits |
| B. | The earthwork calculation in excavation is made from the difference in levels obtained with a level |
| C. | The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers |
| D. | All the above |
| Answer» E. | |