On an average, the programmes months is given by 3.6 x (KDSI)¹·². If so a project requiring one Thousand source instructions will require |
| A. | 3.6 PM |
| B. | 0.36 PM |
| C. | 0.0036 PM |
| D. | 7.23 PM |
| Answer» B. 0.36 PM | |