LiDAR survey for the preparation of a detailed project report (DPR) for the Mumbai-Nagpur High-Speed Rail Corridor started on 12 Mar 2021.This survey is conducted by which organization?

A. Mumbai Rail Vikas Corporation
B. Rail Vikas Nigam Limited
C. Indian Railway Construction Corporation
D. National High-Speed Rail Corporation Limited
E. None of these
Answer» E. None of these