MCQOPTIONS
Saved Bookmarks
| 1. |
Indian Railways completed the Arch closure of the iconic Chenab Bridge in April 2021. What is the length of the bridge? |
| A. | 1034 m |
| B. | 1187 m |
| C. | 1245 m |
| D. | 1315 m |
| E. | 1457 m |
| Answer» E. 1457 m | |