In the loaded-frequency control system with tree governor action, the increase in load demand under steady condition is met, |
| A. | only by decrease of load demand due to drop in system frequency |
| B. | only by increased generation due to opening of steam valve |
| C. | partly by increased generation and partly by decrease of load demand |
| D. | partly by increased generation and partly by increased generator excitation |
| Answer» C. partly by increased generation and partly by decrease of load demand | |