| 1. |
In post-tensioning system |
| A. | wires are fist tensioned followed by concreting |
| B. | tensioning of wires and concreting is simultaneously done |
| C. | the wires are tensioned against hardened concrete |
| D. | none of the above |
| Answer» D. none of the above | |