| 1. |
If manufacturing cycle efficiency is 0.725 and total manufacturing time is 45 minute, then value added manufacturing time will be |
| A. | 2.625 |
| B. | 6.724 |
| C. | 2.625 |
| D. | 1.625 |
| Answer» D. 1.625 | |