MCQOPTIONS
Saved Bookmarks
| 1. |
If binding is done at assembly or load time, then the process _____ be moved to different locations after being swapped out and in again. |
| A. | can |
| B. | must |
| C. | can never |
| D. | may |
| Answer» D. may | |