For lime concreting in roof terracing the concrete...
1.
For lime concreting in roof terracing the concrete shall be kept wet for _____________
A.
6 hours
B.
24 hours
C.
28 days
D.
Fortnight
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Steel reinforcing bars shall be of mild steel or deformed steel of standard specifications.
For controlling the amount of water in cement regular moisture test should be carried out to maintain the required consistency.
During lime concreting in foundation if kankar lime is used 0.35 cu m of kanakar lime shall be used with 20 cu m ballast and no surkhi or sand or cinder shall be added.
During lime concreting in foundation the concrete shall consists of 10 cu m of brick ballast, 0.92 cu m of surkhi and 0.6 cu m of white lime in the proportion of 100:32:16 by volume.
During lime concreting in foundation fine aggregate shall be of surkhi or sand or cinder as specified, and clean and free from dust, dirt, and foreign matters.
Any treasure and valuables or materials found during the excavation shall be the property of the excavator.
For ideal work, plastering should be applied in three coats- the rendering or first coat of 10 mm, the _____________________ and finishing coat of 5 to 6 mm having a total minimum thickness of 20 mm.
During lime concreting in foundation coarse aggregate shall be of hard, well-burnt or over-burnt brick ballast of __________ mm gauge.
DURING_LIME_CONCRETING_IN_FOUNDATION_THE_CONCRETE_SHALL_CONSISTS_OF_10_CU_M_OF_BRICK_BALLAST,_0.92_CU_M_OF_SURKHI_AND_0.6_CU_M_OF_WHITE_LIME_IN_THE_PROPORTION_OF_100:32:16_BY_VOLUME.?$
For controlling the amount of water in cement regular moisture test should be carried out to maintain the required consistency.$
Reply to Comment
×