MCQOPTIONS
Saved Bookmarks
| 1. |
For a typical project, the cumulative cash flow is zero at the%! |
| A. | End of the project life |
| B. | Break even point |
| C. | Start up |
| D. | End of the design stage |
| Answer» C. Start up | |