For a normal RCC work, the slump of concrete should be in the range of |
| A. | 0 - 25 mm |
| B. | 25 – 50 mm |
| C. | 80 – 150 mm |
| D. | 50 – 125 mm |
| Answer» D. 50 – 125 mm | |