MCQOPTIONS
Saved Bookmarks
| 1. |
Final production cost divided by the final duration of the programme is called ________________ |
| A. | Cost per minute |
| B. | Cost per viewer |
| C. | Cost vs measured benefits |
| D. | Actual cost |
| Answer» B. Cost per viewer | |