Direction: The line graph given shows the rate of the production of toys in a factory. Find the expected time to complete producing 8000 toys if the production starts at \[3.45\] p.m.

A.  \[3:50\,p.m\]                   
B.  \[4:20\,p.m\]   
C.         \[4:15\,p.m\]     
D.         \[4:35p.m\]
Answer» C.         \[4:15\,p.m\]     