MCQOPTIONS
Saved Bookmarks
| 1. |
Direction: The line graph given shows the rate of the production of toys in a factory. Find the expected time to complete producing 8000 toys if the production starts at \[3.45\] p.m. |
| A. | \[3:50\,p.m\] |
| B. | \[4:20\,p.m\] |
| C. | \[4:15\,p.m\] |
| D. | \[4:35p.m\] |
| Answer» C. \[4:15\,p.m\] | |