MCQOPTIONS
Saved Bookmarks
| 1. |
Cost required for developing the right product by right method at the first time is called as: |
| A. | cost of manufacturing |
| B. | cost of quality |
| C. | cost of prevention |
| D. | cost of failure |
| Answer» B. cost of quality | |