MCQOPTIONS
Saved Bookmarks
| 1. |
___________ cost of maintenance of the structure __________ construction due to quality works. |
| A. | Maximize, after |
| B. | Minimize, after |
| C. | Maximize, before |
| D. | Minimize, before |
| Answer» C. Maximize, before | |