MCQOPTIONS
Saved Bookmarks
| 1. |
As compared to wall type breakwater, mound type breakwater |
| A. | Requires skilled labor |
| B. | Requires low maintenance cost |
| C. | Requires less material |
| D. | Results in less damage due to gradual failure |
| Answer» E. | |