Activities falling on the critical path have
1.
Activities falling on the critical path have
A.
zero slack
B.
maximum slack
C.
minimum slack
D.
negative slack
Answer» B. maximum slack
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The total time required to complete all the jobs in a job sequence problem is known as ______
The shortest time in the PERT is called ______time
Pick the wrong relationship:
IF the Minimax are ( 10,18,16) and Maximin are (8,10,7). The saddle point is ___
The longest path in the network diagram is called ____
______method is used in Assignment Problem
When the solution is degenerate in transportation problem, we add a _
The outgoing variable row in the simplex table is called ____
The region of feasible solution in LPP graphical method is called ____
________are entities whose value is determined from the solution of LPP
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies