MCQOPTIONS
Home
About Us
Contact Us
Bookmark
Saved Bookmarks
Testing Subject
General Aptitude
Logical and Verbal Reasoning
English Skills Ability
Technical Programming
Current Affairs
General Knowledge
Finance & Accounting
GATE (Mechanical Engineering)
Chemical Engineering
→
Dc Machines
→
Dc Motor Basics
→
A critical path has
1.
A critical path has
A.
Zero float
B.
Minimum float
C.
Maximum float
D.
Infinite float
Answer» B. Minimum float
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The armature of DC motor is laminated to ____________
If a DC motor is connected to AC supply what will happen then?
In normal dc machines operating at full-load conditions, the most powerful electromagnet is _________
In a DC machine, rectification process is carried out in order to get unidirectional output (DC). This rectification process is carried out by ______________a) Half wave rectifierb) Full wave rectifierc) Mechanical rectificationd) Centre tapped rectifier 6.Which of the following part is used in construction of DC machine but not in AC machine?
In which organizational form would the project manager possess the greatest amount of authority?
Productivity performance variance is equal to:
During project staffing, the primary role of line management is
A tractor has a permissible loaded speed of 200 m/ minute, which can increase by 25% when the load is removed/deposited. Generally, it is operated at 80% of the permissible speed (loaded or unloaded). It works at a location where haul distance is 120 m. Rest allowance per round- trip is taken as 50 seconds on an average. Fixed time per trip, for loading and unloading and turnaround, etc., is 30 seconds. What is its effective cycle time?
A contractor agreed to build 30 temporary sheds in 90 days at a price of Rs. 10000/unit. Twenty days later, the contractor has finished 8 sheds with an actual total cost ofRs. 85000. What is the status of the project?
Consider the following statements:P. Walls of one brick thick are measured in square meters.Q. Walls of one brick thick are measured in cubic meters.R. No deduction in the brickwork quantity is made for openings in walls up to 0.1m2 area.S. For the measurement of excavation from the borrow pit in a fairly uniform ground, deadman are left at suitable intervals.For the above statements, the correct option is
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies