MCQOPTIONS
Saved Bookmarks
| 1. |
A bridge culvert is to be constructed across a proposed lined canal. The afflux at this site for a contracted canal width can be computed by __________ |
| A. | Unwin’s formula |
| B. | Broad-crested weir formula |
| C. | Orifice formula |
| D. | Molesworth formula |
| Answer» E. | |