MCQOPTIONS
Saved Bookmarks
| 1. |
A,B and C can complete a work in 10, 12 and 15 days respectively. A left the work 5 days before the work was completed and B left 2 days after A had left. Number of days required to complete the whole work was: |
| A. | 7 |
| B. | 8(2/ |
| C. | 3)6 |
| D. | 6(2/3) |
| Answer» B. 8(2/ | |