| 1. |
A and B together can finish a bit of work in 12 days, B and C can do it in 20 days and C and A do it 15 days. A, B and C together can finish it in |
| A. | 6 days |
| B. | 9 days |
| C. | 10 days |
| D. | 21/2 days |
| Answer» D. 21/2 days | |