MCQOPTIONS
Saved Bookmarks
| 1. |
A and B can separately do a piece of work in 20 and 15 days respectively. They work together for 6 days, after which B was replaced by C. If the work was finished in next 5 days, then the number of days in which C alone could do the work will be______. |
| A. | 160 days |
| B. | 150 days |
| C. | 100 days |
| D. | 125 days |
| Answer» D. 125 days | |